Weste
Four gang saws with thirty or more steel blades were employed in cutting the marble. Railroad track rails were concreted into the ground, and on the rails was a car which went under the gang saw. These rails (which still can be seen today in 1969), extended ten or twelve feet outside of the front of the building so that the marble blocks could be loaded onto the car by the .