Proposed Integrated Steel Plant at Draft EIA Report
Sponge Iron will be produced into two process Tunnel kiln process and DRI kilns. 8 nos. tunnel furnace will be used for tunnel furnace for manufacturing of sponge iron. 4 Nos of DRI Plant of 350 TPD Capacity is envisaged to be set up in the proposed project. The total annual capacity of sponge iron making shall be 435,000 TPA.